Vermont Bids > Bid Detail

GMNF FR59-4.9 Culvert Replacement

Agency: AGRICULTURE, DEPARTMENT OF
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159816168970015
Posted Date: Apr 18, 2023
Due Date: May 5, 2023
Solicitation No: 12441923B0003_Synopsis_Pre-Solicitation_Notice
Source: https://sam.gov/opp/94cb45ef28...
Follow
GMNF FR59-4.9 Culvert Replacement
Active
Contract Opportunity
Notice ID
12441923B0003_Synopsis_Pre-Solicitation_Notice
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA FOREST SERVICE-SPOC EAST
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Apr 18, 2023 04:39 pm EDT
  • Original Response Date: May 05, 2023 05:00 pm EDT
  • Inactive Policy: Manual
  • Original Inactive Date: May 06, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Ripton , VT 05766
    USA
Description

SCOPE OF CONTRACT



The Forest Road 59 – 4.9 Culvert Replacement Contract work shall include, but is not limited to, excavation, removal of existing culvert, layout and construction of the plate arch, construction of concrete substructures, stream simulation, roadway reconstruction, and approach work. The Contractor shall utilize a Government-furnished plate arch. The Contractor shall furnish all new hardware for the plate arch. See Attachments 2 and 5 for additional details.



The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Work in accordance with the Specifications referenced below.



PROJECT LOCATION



FR59 – 4.9 culvert is located in the Green Mountain National Forest in Ripton, VT, 05766 in Addison County.



MAGNITUDE OF CONSTRUCTION PROJECT



Per FAR Subpart 36.204, the anticipated price range of this project is between $250,000 and $500,000.



TECHNICAL SPECIFICATIONS



The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and its revisions are included by reference only (see Attachment 3). Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Invitation for Bid and any resulting contract.



FP-14 can be downloaded directly from the following website free of charge: https://highways.dot.gov/federal-lands/specs.



Please note, it is the responsibility of the Contractor to verify they are using the current version.



In addition to the specifications referenced above, the Forest Service Supplemental Specifications (FSSS) are revisions to the Standard Specifications (FP-14) that incorporate changes and/or additions that are specific requirements unique to this particular project also apply (see Attachment 4).



The applicable Wage Determination is VT20230048 (see Attachment 6).



KEY DATES



Tentative date for issuing the Invitation for Bid is 05/05/2023.



Tentative date for opening bids is 05/23/2023.



Project must be completed by 10/31/2024.



The solicitation and all supporting documents will be posted on this website (SAM.gov) free of charge.



ATTACHMENTS



Attachment 1 - Reserved



Attachment 2 - Plate Arch Assy and Install Manual_For Information Only



Attachment 3 - DOT-FHA Standard Specifications for Construction of Roads and Bridges (FP-14)



Attachment 4 - GMNF FR10-10.4 Culvert Replacement_FSSS_3.30.2023



Attachment 5 - GMNF FR59-4.9 Culvert Replacement_Plans



Attachment 6 - Davis-Bacon Act WD VT20230048


Attachments/Links
Contact Information
Contracting Office Address
  • SPOC EAST 1400 INDEPENDENCE AVE SW, MS-1138
  • Washington , DC 202500001
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Apr 18, 2023 04:39 pm EDTPresolicitation (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >